Back to Projects
Civic Maintenance

NIIT Ganga Ghat Steps

Timeline
2022
Duration
Ongoing (Ends Nov 2025)
Location
Patna, Bihar
Client
Patna Municipal Corporation

Project Overview

A highly visible prestige project involving the rigorous maintenance, beautification, and structural reinforcement of the NIIT Ganga Ghat steps, as well as the construction of a heavy 2-kilometer RCC wall boundary directly spanning the riverfront.

Scope of Work

Riverbank retaining wall excavation and deep foundation construction
Heavy anti-erosion stone pitching to stabilize the riverbank
Casting expansive, slip-resistant reinforced concrete steps
2km continuous protective boundary wall fencing and lighting

The Challenge

Working in a hazardous, flood-prone riverside environment requiring moisture-resistant materials and ultra-rapid execution phases to beat the harsh monsoon flooding seasons.

Our Solution

Implemented specialized waterproofing compounds, anti-erosion base layers, and rapid-deployment steel formwork to construct the 2km RCC wall securely and swiftly before water levels peaked.

Project Impact

Crucially preventing monsoon soil erosion while providing safe, aesthetic, and hygienic recreational access to the holy riverfront for thousands of daily civic visitors and pilgrims.

Image Library

Start a project

Have a similar infrastructural requirement?

Get a Quote